Supreme Floor Covering
This building was a 30,000+ sq ft warehouse with a 3,600 sq ft attached office space that completely burned to the ground. All contents and inventory were lost. We have rebuilt both the office and the warehouse with some new additional pieces. We also have worked with the owner on retrofitting the interior of the building when it comes to flooring, shelving, and other specialty designs.
Golden Glow Ballroom
This 40,000 square foot building was a complete loss due to an electrical fire. Our crew of over 30 people worked on it each day. It was rebuilt and ready for weddings and events in a span of 5 months. Installed were two commercial septic systems with dousing valves, 1000-amp switch gear, and a 5,000,000 BTU furnace system.
SMG Corp
This 700,000 square foot machine shop was a victim of Hurricane Sandy. Due to the storm surge, the building took on over 6 feet of water. The project took a total of 46 days and included eradication of water, mitigation, and remediation.
Saginaw Machine Systems
A lightning strike caused damage to all the machining on the 1st floor and wiped out HVAC and the service entrance for the support offices. This was a large content loss.
Michigan Brewing Company
The brewery sustained a significant amount of water damage, including damage to pipes, pumps, and everything electro-mechanical. This job took a total of 14 days.
United Way
An elevator panel catching fire caused smoke damage through the entire 39,000 square foot building. The building needed immediate ventilation and air scrubbers placed. This job took 3.5 days.
Happy's Pizza
The kitchen catching fire caused damage to the entire restaurant facility. Mitigation and structural work needed to be performed to make sure the building didn’t collapse. The project was put back together to better than pre-loss conditions.
Key West Storage
A car fire in the middle unit caused 18 other units to catch fire in addition to smoke damage to additional units. Strongbacks were placed to secure the structure. New framing needed to be placed and all damaged units rebuilt. Project lasted less than 3 months.
Court St
The tornado that struck Gaylord, MI caused extensive damage and totaled this home. As a result of their policy, the homeowners were built a brand new home of their dreams.
Verellen
This elementary school had a major water loss in the basement causing the entire floor, books, and other supplies to be replaced. There was extensive water mitigation that was performed while the school was in session.
Haven Oaks
2020 Mass flooding caused 4 feet of water damage to the bottom four units. Mold caused some units to be a total loss. Out-of-state owners were pleased that our knowledge of the policy allowed us to receive more than the policy limit.
Garfield
Late night porch fire caused this house to completely burn down. We reached a settlement with the insurance company quickly so the owners could purchase a new home. We handled all city ordinances to have the lot certified.
Stanton
A mattress fire on the top floor spread down the house leading to a total loss that needed complete demolition. We were able to get the homeowners the total amount possible by handling this claim from start to finish, including all the paperwork and demolition of the home.
Rustic
A pool pump caught fire causing interior damage to the entire house and basement. Services included mitigation, remediation, and an entire remodel of the first floor and basement.
Old Kawkawlin
A broken pipe on the second floor caused damage to the entire second story, first story, and the finished basement. This house needed water mitigation and an entire remodel.
Valentine
A victim of the historic 2020 flood, this house had 10 feet of water in the basement and 3 feet on the 1st story. All rooms of the house were affected, including electrical, HVAC, and plumbing. From mitigation to move-in ready took a total of 5 weeks.
Bauer Apartments
The air conditioner caught fire over Labor Day weekend. This caused 3 apartments and common areas to have substantial damage, as well as other 8 units to have smoke damage. This job has water removal, smoke damage and fire damage all to be repaired.